Tuesday, 17 May 2011
WEEK 8 Boundary joist
BOUNDARY JOIST
Setting the boundary joist and clamping the mitre cut for fixing, when joining to boundary joists together. The team, here is happy with their work. Nail the boundary joist with 3 nails to each floor joist end. 25mm in from top and bottom edge amd one the middle.
Setting the boundary joist and clamping the mitre cut for fixing, when joining to boundary joists together. The team, here is happy with their work. Nail the boundary joist with 3 nails to each floor joist end. 25mm in from top and bottom edge amd one the middle.
Arlee is getting those notes down on what he has done for that morning. It is important to fill out the portfolio out everyday and 3 times a day. Fill out the material list, self assessments and the tool box talk.Transfer notes on what you have learnt and done that ay onto your blogger.
WEEK 8 Joists
FLOOR JOISTS
Bearers already for marking out joist spacing, wall positions and where service waste lands. Marking position for timber is marked clearly with a bold line and a X on one side of that line. The X indicate that is where the timber is positioned.
Once bearers are all marked out, set the joist on the X mark. Sorting out where different treated timber and lengths are required in floor plan.
Joist are all laid out and positioned with side of the house that is 15mm in from the outside edge of the bearer. This for the 30mm overhang of the boundary joist.
Once the 30mm overhang is positioned, check this with your stringline. Check the other side of the house and the overhang of the joist over the bearer will be 330mm to the stringline, then run another stringline -47mm from the 330mm stringline for boundary joist. Use a combination square to mark a plumb line from the singline, cut all joist to that -47mm line.
Monday, 16 May 2011
WEEK 7 Floor joists
FLOOR JOIST
The floor joists are sorted from the packet to see if the right lengths and quantity were delivered to site. The joist packet allowed for H3.2 joist in the kitchen.
The floor joists are sorted from the packet to see if the right lengths and quantity were delivered to site. The joist packet allowed for H3.2 joist in the kitchen.
Mark joist to plan and consider where walls land and service pipes will be ie. Toilet and shower waste pipes.
How do we provide a service area if a joist is in the way of a waste pipe?